Vocabulary

The terms used in these notes, and where each one comes from.

Why this page exists

A method is only adopted if it can be spoken about. These notes therefore use a small, fixed vocabulary, and this page is where each term is defined.

Two disciplines govern it. Coin sparingly — a name is claimed only where no adequate one exists. Never rename — where a concept already has an established name, that name is used unchanged, however tempting a fresher one might be. Renaming a seventy-year-old idea is the fastest way to lose the readers who know the literature, and it is not a contribution.

Each entry states whether the term is new, adapted, or standard.

Judgment — how priorities are established

Declared weight

Standard · ratio-scale weights follow from AHP (Saaty, 1977)

The relative importance an organization has stated for a strategic driver, arrived at through structured comparison rather than typed in directly. Declared weights are ratio-scale: a weight of 40 against a weight of 8 asserts five times the importance, not merely a higher rank.

The range

Adapted · sensitivity intervals are standard in decision analysis; reporting them on an executive surface is not

The interval within which a declared weight sits, given the precision of the judgments that produced it. Every weight has one; almost no tool reports it.

Calibration price

New

The cost of departing from a judgment you have already declared — expressed, recorded, and shown at the moment of departure. Overriding a declared weight is permitted; doing so silently is not.

Selectivity

Adapted · used here critically

The practice of applying an exponent or curve to declared weights to sharpen or flatten the resulting priorities. Selectivity preserves rank order while destroying ratio meaning, which is why these notes treat it as a defect rather than a feature.

Selection — how a portfolio is chosen

Distance to flip

Adapted · this is a stability radius, standard in parametric optimization

How far the world must move before an initiative's status changes — expressed in the units of whatever moved: dollars of cost, dollars of envelope, or shift in declared priority. What is proposed is its place on an executive screen, not the measure itself.

The boundary

New as a presentation · the underlying sensitivity is standard

The region of a portfolio where the decision is genuinely uncertain, comprising four bands: held, borderline in, borderline out, and out. A portfolio boundary is a zone, not a line.

Priced lever

New

A stated, finite change that would alter an initiative's status: reduce its scope by a given percentage, increase the envelope by a given amount, or force it in and accept named displacement. Ratings are never a lever.

Extensive and intensive quantities

Standard · borrowed from physics and thermodynamics

An extensive quantity scales with the size of the portfolio — total value, total cost. An intensive quantity does not — value per dollar, a ratio. The objective coefficient of a selection problem must be extensive. If what you want to maximise is a rate, it belongs in a constraint.

Pipeline supply

New as a term · the underlying comparison is not

The share of proposed spend that actually stands behind each declared driver, compared against that driver's declared weight. A driver with declared weight and no initiatives exists on paper only.

Decision — how the choice is made and recorded

Decision surface

New

A screen whose purpose is to support a specific executive decision, presenting the properties of the solution rather than the properties of the inputs. A ranked list of scores is not a decision surface; it is a readout.

The desk

New as used here

The place where a committed decision is changed. Every amendment is priced before it is accepted, and the acceptance belongs to the person accountable, not to the software.

Inference firewall

New

The separation between what is computed and what is explained. Mathematics decides; language describes. No recommendation originates in a generative model.

Decision record

Adapted · from ordinary governance usage, with the last clause added

The durable account of what was decided, under what constraints, against which declared strategy, and what would have had to change for the outcome to differ.

Allocation and automation — how money moves and who decides

Maintain, deliver, build, retire

New as used here · an alternative to Run-Grow-Transform

What an investment's money does: keeps an asset running, delivers a change, builds a lasting capability, or retires something. Each investment is tagged once, and the split among the four comes out of the optimization rather than being set in advance.

Container

New as used here

Anything that receives an envelope of money or capacity before projects are chosen inside it: a business unit, a program, a capability, a value stream. Allocation happens at two levels, to containers and to projects, and prices link them.

Augmentation, supervised, autopilot

Adapted · from the levels of automation (Sheridan and Verplank, 1978)

Three ways a decision can be made with a machine. In augmentation, people decide and the machine informs. Supervised, the machine proposes and people review where the margin is thin. On autopilot, the machine prepares the decision within rules and people are called in when a rule trips. The mode belongs to the decision, not to the software.

Terms deliberately not coined

Several concepts in these notes already have established names, and those names are used unchanged:

Cite as: Gruia, M. (2026). Vocabulary. Frontnovo Method Notes.